Building, Airport Sub, since 1927
Coleman A. Young International Airport
Standing and open
- Opened
- 1927
- Standing
- 99 years
Designed by Perry A. Fellows
Coleman A. Young International Airport has stood on Conner St. in Airport Sub since 1927, 99 years and counting. Who built it, what makes it special and how to see it for yourself.
Coleman A. Young International Airport today, from the street
What is there now
Under renovation
- Standing and open Source: Historic Detroit
Building permits at this address
17 permits since June 2025
$31.9 million in declared work (6 of 17 name a figure) Newest: Electrical permit, September 9, 2026
-
Electrical permit
All buildings wiring and installing lights and Generator 45KVA
-
Electrical permit
Full temp. control installation
-
Fire alarm permit
Install a new Fire Alarm System
-
Mechanical permit
Gas Piping
-
Elevator permit
City #8318-2500-3-temp 15 days expire-10-1-26 Furnish & install new pumping unit complete, controller, car... Read all
City #8318-2500-3-temp 15 days expire-10-1-26 Furnish & install new pumping unit complete, controller, car & hatch door
-
Boiler permit
DT-B020890 NB#102032 - NEW INSTALLATION 2026 - Hydronic/Hot Water Heating Boiler - 84 sq. ft. heating... Read all
DT-B020890 NB#102032 - NEW INSTALLATION 2026 - Hydronic/Hot Water Heating Boiler - 84 sq. ft. heating surface - BOILER #
-
Boiler permit
DT-B020976 NB#102029 - NEW INSTALLATION 2026 - Hydronic/Hot Water Heating Boiler - 84 sq. ft. heating... Read all
DT-B020976 NB#102029 - NEW INSTALLATION 2026 - Hydronic/Hot Water Heating Boiler - 84 sq. ft. heating surface - BOILER #
-
Boiler permit
DT-P015286 NB#467671 - NEW INSTALLATION 2026 - Thermal Expansion Tank - ET-1
-
Boiler permit
DT-P015249 NB#7129 - NEW INSTALLATION 2026 - Air/Water Separator Vessel - A/S 1
-
New revision permit
Revision to BLD2025-02887 to Code per plans. (Construct 20,000 sq ft Hanger & 5,000 sq ft Office &... Read all
Revision to BLD2025-02887 to Code per plans. (Construct 20,000 sq ft Hanger & 5,000 sq ft Office & associated Site Work
$1
-
Plumbing permit
Plumbing
-
New revision permit
REVISION TO BLD2024-01875 TO SHOW TRUE SCOPE OF WORK (Construct 20,000 sq ft Hanger & 5,000 sq ft Office &... Read all
REVISION TO BLD2024-01875 TO SHOW TRUE SCOPE OF WORK (Construct 20,000 sq ft Hanger & 5,000 sq ft Office & associated Si
$5.8 million
-
Alteration permit
Site work to Code per plans. Subject to Field Approval. Separate DPW Right-of-Way Permits, DWSD Permits... Read all
Site work to Code per plans. Subject to Field Approval. Separate DPW Right-of-Way Permits, DWSD Permits required.
$10,000
-
Alteration permit
Change of Occupancy/Use to School (Vocational/Technical) & alterations for the Davis Aerospace High School... Read all
Change of Occupancy/Use to School (Vocational/Technical) & alterations for the Davis Aerospace High School to Code per p
$14.6 million
-
New revision permit
Revision to BLD2024-01875 to Code per plans. (Construct 20,000 sq ft Hanger & 5,000 sq ft Office &... Read all
Revision to BLD2024-01875 to Code per plans. (Construct 20,000 sq ft Hanger & 5,000 sq ft Office & associated Site Work
$5.8 million
-
Plumbing permit
New Hanger construction.
-
New permit
Construct 20,000 sq ft Hanger & 5,000 sq ft Office & associated Site Work per plans. Subject to Field... Read all
Construct 20,000 sq ft Hanger & 5,000 sq ft Office & associated Site Work per plans. Subject to Field Approval.
$5.8 million
No permits match.
Source: City and county building permits
We checked building permits, sales, listings and the city's blight and demolition files on October 25, 2026.
The story
Coleman A. Young International Airport opened in 1927, in the years Detroit became the Motor City and built like it meant to stay on top.
Perry A. Fellows drew the plans.
It is still open, and still part of daily life in the city.
Go see it at 11499 Conner St. Photos never get the scale right.
Timeline
- 1927 Built Designed by Perry A. Fellows
- 2025 6 building permits $31.9 million in declared work, the latest December 16
- 2026 11 building permits $1 in declared work, the latest September 9
- 2026 Today Under renovation
Where it is
11499 Conner St.
On this map
- 1 Coleman A. Young International Airport This place
- 2 New Elementary School 0.6 mi
- 3 Wilkins Elementary School 0.9 mi
- 4 Lynch School 0.9 mi
Street map from OpenStreetMap contributors
Who made it
More from Detroit in the 1920s
-
Broderick Tower
Structure, built 1927, Beaux Arts, by Louis Kamper
Photo: St8fan, CC BY-SA 4.0, via Wikimedia Commons
-
Cadillac Tower
Structure, built 1927, Late Gothic Revival, by Bonnah & Chaffee
Photo: Andrew Jameson, CC BY-SA 3.0, via Wikimedia Commons
-
Belcrest Apartments
Building, built 1926, Neo-Romanesque, by Charles N. Agree
Photo: Andrew Jameson, CC BY-SA 3.0, via Wikimedia Commons
-
Cooley High School
School, built 1928, Mediterranean Revival, by Donaldson & Meier, demolished 2026
Photo: Chuckjav, CC BY 3.0, via Wikimedia Commons
-
Ambassador Bridge
Structure, built 1929, by Jonathan Jones
Photo: Antony-22, CC BY-SA 4.0, via Wikimedia Commons
-
Buhl Building
Skyscraper, built 1925, Neo-Romanesque, by Wirt C. Rowland
Photo: I, Mikerussell, CC BY-SA 3.0, via Wikimedia Commons
Around the block
It is in Airport Sub. See the neighborhood's homes, pros and story.
Photo credits
Every photo on this page is used under its license, named here with its author and a link to the original.
- Coleman A. Young International Airport from the street today Photo: Street View, 2026
Sources
Facts only, gathered from these sources. The story above is written by Rebuild Detroit. Every photo names its author and license where it appears.